Services

Court resurfacing

Restore playability, refresh colors, and extend the life of your court with professional resurfacing using premium acrylic coating systems.

Even well-built courts need resurfacing every 4–8 years. Weather, UV exposure, and play wear break down coatings, fade colors, and create surface irregularities that affect ball bounce and player safety.

We assess the existing foundation, repair cracks and structural issues, then apply fresh coating systems with proper adhesion primers, texture layers, and finish coats. Line work is restriped to regulation dimensions with clean, crisp edges.

The result is a court that looks new, plays true, and is ready for years of use.

Surface options

Hard acrylic

Standard multi-layer acrylic system with excellent durability and consistent bounce. Ideal for tennis and pickleball.

Cushioned acrylic

Impact-absorbing layers beneath the surface reduce joint stress and provide a softer feel for extended play.

Textured & fast-dry

Coatings engineered to shed water quickly and provide enhanced traction in all conditions.

What we do

  • Surface assessment and crack repair
  • Pressure washing and surface prep
  • Primer and adhesion coat application
  • Multiple texture and finish coats
  • Precision line work for your sport(s)
  • Optional color changes or custom designs

When to resurface

  • Faded or worn colors that affect visibility
  • Surface cracks or minor settling
  • Rough or uneven texture from UV breakdown
  • Outdated line work or sport configuration
  • Every 4–8 years as preventive maintenance

Color customization

Resurfacing is an opportunity to refresh your court's look. Choose from standard colors (blues, greens, reds, and neutrals) or create custom color schemes that match your property or branding.

Multi-color designs with playing zones, borders, or logos are available for courts that want visual distinction or need to differentiate multiple sports.

Timeline & curing

Most resurfacing projects take 3–7 days from start to finish, depending on weather and the number of coats. Each layer needs proper dry time before the next can be applied.

Courts are playable 3–5 days after the final coat, with full cure reaching maximum durability within 30 days. We schedule work during favorable weather windows to ensure proper application.

Refresh your court

Schedule an assessment and we'll inspect your court, recommend the right coating system, and deliver a proposal with color options and timeline.

Get a quote